Configuration
1, 2, 3 BHK Flat
Possession Starts
Dec, 2025
Launch Date
Jul, 2023
Overview
Price
₹16 L - ₹37.82 L
Configuration
1, 2, 3 BHK Flat
Project Area
3.63 Acre
Size
350 SqFt - 830 SqFt
Project Status
Under Construction
Total Towers
9
No. of Floors
4
Total Units
252
Possession Starts
Dec, 2025
Launch Date
Jul, 2023
Parking
Two wheel, Four wheel
RERA Id
WBRERA/P/SOU/2023/000306
Project USPs
G+4 storey for vertical living
Well Designed Entrance & Floor Lobbies
Spacious 1, 2 and 3 BHK Homes
20+ amenities across 2 levels
Vastu-compliant homes designed for ultimate comfort
Floor Plan
Location
Nearby Places
Madarat Popular Academy (1min)
Rashmoni Balika Vidyalay (1min)
Antara Hospital(6min)
Baruipur Junction (2min)
Shasan Road (5min)
Alfi Roll Center (1min)
Deepshikha Market Complex (2min)
Address
On Map
Amenities
24x7 Security
24X7 Water Supply
Car Parking
CCTV
Children's Play Area
Community Buildings
Conference Room
Fire Extinguiser
Garden
Gated Community
Gymnasium
Indoor Games
Jogging Track
Landscaped Gardens
Meditation Area
Multipurpose Room
Partial Power Backup
Pet Friendly
Piped GasConnection
Rainwater Harvesting
Reception Area
Security Cabin
Security Gate
Senior Citizen Corner
Solar Lighting
Street Lighting
Swimming Pool
Vastu Compliant
Video Door Security
Visitor Parking
Water Storage
Yoga Deck
Janitor Room
School Drop off Zone
Automated Entrance Gate
Two Lifts In Each Block
Walking Track
Ample Parking
RCC Road
Attractive Lounge area
Meter Room Space
Brochure
Architects and builders though we are, we believe that every brick, every floor plan, and every foundation should not serve to only build structures. Instead, we attempt to weave magic in all we do, helping magically to transform dreams and aspirations into reality. Because, within these aspirations reside joy, comfort, and a profound sense of belonging. Aspirations are not to be trifled with; which is why, it has always been our sincerest endeavor over the last four decades to build emotional connections with our customers - first and foremost.
FAQs
What is the location of Merlin Oikyo Phase 1?
Who is the developer of Merlin Oikyo Phase 1?
When was Merlin Oikyo Phase 1 launched?
What is the possession date for Merlin Oikyo Phase 1?
What configurations are available in Merlin Oikyo Phase 1?
What amenities are available at Merlin Oikyo Phase 1?
What are some nearby landmarks to Merlin Oikyo Phase 1?
Is Merlin Oikyo Phase 1 RERA registered?
How can I schedule a site visit for Merlin Oikyo Phase 1?